Chantiers Admin EBOMAF

Parade axis in Koudougou: Prime Minister sets in line with construction site

Parade axis in Koudougou: Prime Minister sets in line with construction site

The construction of infrastructure within the framework of the festivities of the national holiday in the town of Koudougou is of the utmost concern to the government. The start-up of the works, the effectiveness of the works and the conduct of the planned works are all points of interest to some five (5) months from 11 December.

Prime Minister Beyon Luc Adolphe Tiao, in person, made this observation on Saturday 30 June in the city of the "Red Horseman". He weighed on Lot 1:"Planning and bitumening of the parade axis". EBOMAF is responsible for building this infrastructure. She's doing great.

The road to the parade site has received the full attention of the Head of Government. At the pace of the race, Beyon Luc Adolphe Tiao and his sequel traveled the five (5) kilometers to double in two tracks. He saw how the work was going on in the field. The Prime Minister appreciated the seriousness with which EBOMAF carries out its share of infrastructure related to the commemoration of the national holiday.

Guided by technicians, Luc Adolphe Tiao reported on the company's work methodology. She put all the artillery in place to fill the contract. The realization of the axis of the parade, considered the most important work of December 11th, channeled all energies. Both the government and the inhabitants of the city of Koudougou are expected to build this infrastructure.

The physiognomy of the axis already convinces unanimously. It's a real boulevard that points to the horizon. Beyon Luc Adolphe Tiao offered all his encouragement to EBOMAF workers.

He took the opportunity of his visit to reassure the successful contractor that the financial difficulties which she faced with the image of the other awardees will be lifted within a maximum of two weeks. This commitment by the Head of Government of Burkina Faso assured them of the assistance of the State to ensure that the work was carried out within the required time.

FK/JE


Commentaires (0)

Laisser un commentaire

Vous devez être connecté pour commenter

Articles récents

A Field Mission of the Governor of the Estuary on Compensation for Affected Populations
September 26, 2025

A Field Mission of the Governor of the Estuary on Compensation for Affected Populations

Lire l'article →
Public Works test the solidity of the future bitumen on the Ntoum-Cocobeach site
July 10, 2025

Public Works test the solidity of the future bitumen on the Ntoum-Cocobeach site

Lire l'article →
... visitors online
... visitors this month